Environmental Documents
- 2018 Notice of Preparation
- 2018 State Water Interconnection Alignment Study (pt. 1)
- 2018 State Water Interconnection Alignment Study (pt. 2)
- 2018 State Water Interconnection Scoping Report
- 2019 Notice of Availability
- 2019 Draft Environmental Impact Report
- 2019 Final Environmental Impact Report
- 2019 Notice of Determination
- City of Ventura Council Report and Addendum #1
- 2022-05 NOI for Public Review Lindero Pump Station
- 2022-05 Draft IS-MND Lindero Pump Station Rehabilitation
- Appendix A – Health Risk Assessment
- Appendix B – CalEEMod Emissions Calculations
- Appendix C – Special Status Species Tables
- Appendix D – NOD
- Appendix E – Cultural Resources Report + Attachments 1-4
- Appendix F – Energy Calculation Sheets
- Appendix G – Operational Noise Analysis
- Appendix H – RCNM Noise Calculations
- Final IS-MND- Responses to Comments on the Draft Initial Study
- Final IS-MND- Errata to the Draft Initial Study
- Final IS-MND- Mitigation Monitoring and Reporting Program