Skip to content
Select Language
Afrikaans
Albanian
Amharic
Arabic
Armenian
Azerbaijani
Basque
Belarusian
Bengali
Bosnian
Bulgarian
Catalan
Cebuano
Chichewa
Chinese (Simplified)
Chinese (Traditional)
Corsican
Croatian
Czech
Danish
Dutch
English
Esperanto
Estonian
Filipino
Finnish
French
Frisian
Galician
Georgian
German
Greek
Gujarati
Haitian Creole
Hausa
Hawaiian
Hebrew
Hindi
Hmong
Hungarian
Icelandic
Igbo
Indonesian
Irish
Italian
Japanese
Javanese
Kannada
Kazakh
Khmer
Korean
Kurdish (Kurmanji)
Kyrgyz
Lao
Latin
Latvian
Lithuanian
Luxembourgish
Macedonian
Malagasy
Malay
Malayalam
Maltese
Maori
Marathi
Mongolian
Myanmar (Burmese)
Nepali
Norwegian
Pashto
Persian
Polish
Portuguese
Punjabi
Romanian
Russian
Samoan
Scottish Gaelic
Serbian
Sesotho
Shona
Sindhi
Sinhala
Slovak
Slovenian
Somali
Spanish
Sundanese
Swahili
Swedish
Tajik
Tamil
Telugu
Thai
Turkish
Ukrainian
Urdu
Uzbek
Vietnamese
Welsh
Xhosa
Yiddish
Yoruba
Zulu
About Us
Overview
Agendas & Minutes
Board of Directors
Leadership Team
Member Purveyors
District History
Public Notices
Calleguas in the News
Your Water
Overview
Water Use Efficiency
Water Quality
Find Your Water Supplier
Rates & Charges
Projects & Programs
Capital Projects
Salinity Management Pipeline
Work with Us
Overview
Accounts Payable
Builders & Developers
Project Bidding
Construction Near Calleguas Facilities
Annexation
Human Resources
Transparency
General Information
Financial Information
Board of Directors
Policies and Ordinances
Environmental Documents
Request Information
Contact Us
Search
Form: Discharge Service Information Request
"
*
" indicates required fields
Name of applicant (discharger)
*
Person submitting on behalf of discharger
*
Email
*
Phone Number
*
1. Type of discharge (brine, recycled water, groundwater, etc.)
*
2. Attach available analysis of the water quality of the anticipated discharge. (pdf, jpg, png)
*
Accepted file types: jpg, jpeg, pdf, png, gif, Max. file size: 25 MB.
3. Attach map of approximate location of desired connection. (pdf, jpg, png)
*
Accepted file types: jpg, jpeg, pdf, png, gif, Max. file size: 25 MB.
4. Estimated initial minimum/maximum flow rates
*
5. Estimated ultimate minimum/maximum flow rates
*
6. Attach a drawing and a brief written description of the facilities that will discharge flows through this service connection. Show major facilities including treatment facilities, pipelines, regulation and control facilities, surge protection equipment, and pumps, with applicable capacities.
*
Accepted file types: jpg, jpeg, pdf, png, gif, Max. file size: 25 MB.
7. Is this discharge anticipated to be consistent year-round?
*
Yes
No
Please explain the anticipated seasonal variability.
8. Can this discharge operation be stopped with the automatic closure of a valve in less than 5 minutes?
*
Yes
No
9. Is flow to be discharged through this service connection to be pumped?
*
Yes
No
10. If flow to be discharged through this service connection is to be pumped, attach a list showing the number of pumps to be employed and the design head discharge characteristic for each pump.
Accepted file types: jpg, jpeg, pdf, png, gif, Max. file size: 25 MB.
11. Will an easement be required for installation, operation and maintenance of a discharge service connection with a footprint of X by X, including vehicular ingress and egress of no less than 20' in width?
*
Yes
No
(If yes, then such easement must be provided by discharger without cost to the District before construction can be bid.)
12. Date of desired initial discharger through this service connection
*
13. Anticipated date of ultimate discharge through this service connection
*
14. Does the discharger want operational feedback from the CMWD service connection for monitoring and control? No discharger equipment may be mounted in or on the Calleguas control cabinet.
*
Yes
No
15. Does the discharger wish to have local cabinet space provided for communications and other equipment? No discharger equipment may be mounted in or on the Calleguas control cabinet.
*
Yes
No
16. Additional comments
CAPTCHA
Comments
This field is for validation purposes and should be left unchanged.
Notifications